Friday, January 18, 2008
after 5 months of hard, banga work (sorry, no offence), the setup is finally done. the spires are mounted, the planks mounted, the roughness fetch done. the roughness fetch, which are done by painstakingly drawing lines and then gluing the cubes on the plywood 1 by 1 looks so beautiful on the wind tunnel floor. after all the delay.. the computer crashing, the manometer not working and being inaccurate. real data can finally be collected.. whoo hoo.. not much time left. hopefully everything runs properly and smoothly this time.. =) front view of spires
side view of spires
front view of spires and roughness fetch
full stretch of roughness fetch.. guess the number of cubes.. haha..
cubes making up the roughness fetch.
another view of the cubes.
full roughness fetch with spires again.
roughness fetch to the turntable view.
view of wind tunnel near the turntable.
turntable. even the plastic supports at the sides have to be hand-made...